Rationalising a $1bn SGD API facility to reduce cost, carbon and operational demand.
Bryden Wood were initially appointed by a leading global pharmaceutical company to review and optimise the concept stage design for the dry processing building at a new $1bn SGD API (active pharmaceutical ingredient) plant in Singapore. After delivering a radically improved proposal (which was adopted as the client’s preferred design), Bryden Wood’s engagement was extended to include the wet synthesis building and then extended again to consider site-wide rationalisation opportunities.
Project details:
-
-
-
Analysis of the critical relationships between core equipment was used as a basis, followed by development of building and service strategies, giving particular attention to process safety requirements and local fire codes.
Our proposed improvements to the design of the wet building left the process untouched but reduced the volume to reduce capital and operating costs. The dry and wet buildings were integrated into a single volume encompassing the site’s core functions.
Following this we conducted a site-wide study, consolidating ancillary functions and site-wide infrastructure around the core process.
At every step, our rationalised proposals reduced operational costs and resulting CO2 emissions.
Including:
10% annual reduction in MVAC load
55% reduction in boiler demand
Reduction in site footprint and overall construction material quantities and costs resulted in an estimated 20% overall CAPEX reduction without reducing functionality.
Lessons from the study were adopted in the detailed design and delivery of the plant which received an ISPE Facility of the Year award in 2024.